[In these minutes: Stadium Survey Discussion]
STUDENT SENATE
CONSULTATIVE COMMITTEE (SSCC) MINUTES
DECEMBER 19,
2003
[These minutes reflect discussion and debate at a committee of
the University of Minnesota Senate or Twin Cities Campus Assembly; none of the
comments, conclusions, or actions reported in these minutes represent the views
of, nor are they binding on, the Senate or Assembly, the Administration, or the
Board of Regents.]
PRESENT: Dan Weiske, (chair), Joshua Colburn,
Levi Kary, Scott LeBlanc, Charles Stech, Jeremy Steil, Adam VanWagner, Dan
Weiske.
REGRETS: Sean Bell, Derek Brunsberg, Jeff Dahl, James
Kanten, Ryan Osero,
GUESTS: Lynn Holleran, Brian
Swanson.
1. STADIUM SURVEY DISCUSSION
Lynn Holleran, from
the Chief of Staff’s Office, distributed the stadium feasibility study to
the committee, noting that the study is just the first step in the process and
no decisions have been made yet. The issue, however, does need to be addressed
at this time.
In May 2002, a joint-use task force was formed to look at a
shared stadium for the University and the Minnesota Vikings. In November 2002,
the Vikings determined that an on-campus stadium would not meet their needs, and
the University agreed. In August 2003, the Vikings and Minnesota Twins both
announced their intentions to leave the Metrodome. With their departure, the
only tenant would be the University, but it could not afford upkeep on the
Metrodome. Therefore, a study was started to gather information on what is in
the best interest of the University.
Brian Swanson stated that the
University needs to consider where the Gophers will play in the long-term. If
they remained at the Metrodome, it would cost $7-10 million per year without the
Vikings. If the Gophers do not stay at the Metrodome, there are two options.
First is an on-campus, Gophers-only stadium. The second is to continue to share
a stadium with the Vikings, which might mean playing in venue, described as an
entertainment complex, farther from campus than the Metrodome.
From the
joint-use stadium study, the University decided what was appropriate for its
need is a 50,000 seat, open air stadium that is close to, or on, campus at
roughly the same height as other sports complexes. With the smaller stadium
size, it would also be possible to reclaim lost parking through construction of
new surface lots, rather than ramps. Surface lots would keep construction costs
low and allow parking rates to stay the same.
Brain Swanson said that the
proposed stadium would be an adaptable structure so that it can be used as much
as possible. Most of the seating would be benches, but it would also have club
seats, 35 regular suites, and a few larger suites. An event plaza would also be
constructed outside, about the size of Northrop Mall, that would allow Oak
Street to be closed on game days.
He said that the cost for a joint-use
stadium would have been $598 million. For an on-campus stadium, the cost would
be $180 million ($160 million for construction, labor, and materials; $20
million for soft costs of inflation and contingencies). Other construction
costs include the cost for buying extra building sites, clean up of the ground,
moving ground, and redistricting of transportation and utilities. The grand
total would be $222 million.
Q: From the diagram, the stadium will be
horseshoe-shaped. Why will the bowl not be complete?
A: The design
allows for expansion of the bowl, by filling the missing section, if extra
capacity is needed in the future. Some institutions use part of the stadium for
athletics’ administration, but this is not needed here because of the
Bierman Building.
Brian Swanson then said that the marching band would
also be housed in the new stadium, with a separate entrance to its
facilities.
Q: Will the stadium covering be Astroturf?
A: An
artificial grass, called Astroplay, will be installed which will allow more
groups to use the field, such as soccer. The surface will be easy to maintain
and can even be snowplowed in the winter for use.
Lynn Holleran then
stated that another reason for the feasibility study was to use it as a tool to
secure funding. Six different funding streams are being proposed: private
sources, legal settlement monies from the railroads for soil clean-up, stadium
revenues estimated to be $3.5 million more per year than at the Metrodome,
parking revenue, students, and state funds that would not be in competition with
academics but might be offered if the Vikings and Twins also receive financial
support.
Q: What was the cost for the study?
A: The feasibility
study cost $45,000, which was paid from private funds and was much lower than
expected because of good deals from companies that participated in the
study.
Q: Would bonds be required for the stadium?
A: If the
University incurs debt, 30 year bonds would be issued, but they could be paid
back faster if more revenue is generated.
Q: What is the anticipated life
of the stadium?
A: The structure would be built to last at least 100
years, and is flexible enough to adapt to changing needs.
Q: What
assumptions were made when calculating the revenue stream from the
stadium?
A: The only revenue counted was game day revenues from parking
and ticket sales, including a one-time ticket increase of 10-12 percent.. The
stadium could also generate other revenue through other uses, but that was not
assumed in the planning since other events would likely be booked in facilities
operated by the Twins or Vikings because of less hassle than dealing with
University regulations. Student tickets prices would remain the same, with an
increase solely for inflation.
Q: What would be the cost to start playing
on-campus in 2008 and not in the Metrodome for the last three years of the
contract?
A: The University would not have any penalties for leaving the
Metrodome early, and the Vikings hope that the Legislature could negate all the
contracts for the building if new complexes are built.
Q: Is there still
a possibility for funding from Denny Sanford?
A: He is no longer a
potential donor, but the University is pursuing many other options.
Q:
Are there any costs not included in the plan?
A: One cost, not
anticipated at the beginning, might be closing in the East side of the stadium
at some point. In the current plan, it would remain open to the elements, and
would be shutdown when not in use. If it is enclosed in the future, a
connection to the campus steam pipe would be needed to provide heat.
Q:
Is the site deemed hazardous?
A: There is a hazardous material at the
site, kreasote, which was also found under Mariucci Arena. Clean-up was started
by the former company, but not finished. Most material could be treated on site
before removal.
Q: Does the site have an aquifer problem?
A: This
would have been an issue with a joint-use stadium, but with the smaller size of
the Gophers-only stadium, the structure will not enter the water
table.
Q: What will the University do if the bids received are more than
the anticipated construction price?
A: The University does not anticipate
an overbid with the use of a construction manager and a hybrid of the
design-build and design-bid-build models.
Q: Is the style, as seen in the
plans, finalized?
A: No. The study just shows one idea, and enough to
get a cost.
Q: Will coordinate campus students pay for the
stadium?
A: No.
Lynn Holleran said that many students want
tangible details, such as ticket sales and cost, but there is also value to
intangibles. A University Relations study reports that over 50 percent of
outside people contact the University through athletics.
Brian Swanson
said that there is an advantage to getting football back on campus since it
allows for an open house of the entire campus six times per year. Planning
would be done to schedule other events before and after a game so that people
take in more of campus than just athletics. An on-campus stadium would also be
a connection for older donors who might not have been on campus in the past 20
years.
Q: What is the community reaction to the proposal?
A: The
community is very supportive of the new proposal, and many concerns from the
joint-use stadium are no longer an issue.
Brian Swanson said that the
next step is to look into funding options and talk with students and their
needs.
Lynn Holleran then stated that another consideration for the venue
is recreational sports. Which could also use the facility, but it might require
additional funding. There is also a Governor’s Steering Committee looking
at the issue of stadiums for all three teams. The University did its own study
so that it does not let someone else decide what is best for campus.
With
no further business, Dan Weiske thanked all members for attending and adjourned
the meeting.
Becky Hippert
University Senate